Projects

Summary of Recent Almasi – Genergy Solar Projects

Partner Project Location System Type System Size (kWp / kwh) Year Support
Almasi Melia Zanzibar Zanzibar Hybrid system 3,000 kWp / 4,000 MWh On going Design and Engineering
Almasi ZF Devco Ferry Port Zanzibar Hybrid 700 kWp/ 550 kWh On Going Design, Installation and Commissioning, Operating & Maintenance
Almasi Zanbluu Resort Zanzibar Hybrid 70 kWp/90 kWh On going Design and Installation works
Almasi Multicable Factory Kenya Grid tied 250 kWp On going Installation and Commissioning
Almasi Manta Resort Zanzibar Hybrid system 125 kWp / 164kWh On going Design, Procurement, Installation
Almasi ID Fabric Tanzania Grid tied 120 kWp 2024 Decommissioning and Recommissioning
Almasi Karume Institute Zanzibar Hybrid system 125 kWp 2025 Decommissioning and Recommissioning
Almasi Kokota Island (OFF Pemba) Zanzibar Hybrid system 80 kWp / 160 kWh 2022 Project Management and Procurement
Almasi Njau island (Off Pemba) Zanzibar Hybrid system 50 kWp / 100 kWh 2022 Project Management and Procurement
Genergy RDM Plant South Africa Grid tied 5,062 kWp / 8,385 kWp 2023 Design and Installation works
Genergy General Motors South Africa Grid tied 1,932 kWp / 2,764 MWh 2023 Design and Installation works
Genergy Coega Diary South Africa Grid tied 1,171 kWp / 1,710 MWh 2019 Design and Installation works
Genergy PE Cold Storage South Africa Grid tied 821 kWp / 1226 MWh 2020 Design and Installation works
Genergy Nautica Shopping Center South Africa Grid tied 770 kWp / 1,310 MWh 2023 Design and Installation works
Genergy Showgrounds South Africa Grid tied 710 kWp / 981 MWh 2021 Design and Installation works